Ester Industries Limited. Oct 2019 - Present2 years 2 months. -Operations and maintenance of 14 ton Husk fired (AFBC type) water tube boiler. -Operations and maintenance of 2*6 ton oil fired boilers. -Operations and maintenance of 10 Mkc/hr and 7 Mkc/hr husk fired Thermic fluid heaters.
Read MoreSatbir Singh, Director of Boiler Punjab cum Chief Inspector of Boiler Punjab at Jalandhar. 2. Vishav Bandhu, Deputy Director (Boilers), Office of Punjab Bureau of Investment promotion, Udyog Bhawan sector 17 chandigarh, In case payment is not reflected at
Read More2020/9/2 · The present study investigates the high-temperature corrosion behavior of plasma-coated boiler steel for 1000 h in a 110-MW water tube boiler, which had encountered severe corrosion and the tube failure. The coating was carried out by alumina and MWCNTs (multiwalled carbon nanotubes)-reinforced alumina composite powders. The uncoated and coated steel substrates were hung at a …
Read MoreSatbir Singh, Director of Boiler Punjab cum Chief Inspector of Boiler Punjab at Jalandhar. 2. Vishav Bandhu, Deputy Director (Boilers), Office of Punjab Bureau of Investment promotion, Udyog Bhawan sector 17 chandigarh, In case payment is not reflected at
Read MoreCopyright © 2021.Boiler All rights reserved.